Warning: file_put_contents(/www/wwwroot/www.1000114.com/index/temp_block/www.indyvcr.com/dirzddrpvpobtvithtml.php): failed to open stream: No space left on device in /www/wwwroot/www.1000114.com/index.php on line 131
宝宝我们在水里好不好宝宝我们在水里好不好,宝宝乖老公硬的难受宝宝乖老公硬的难受

宝宝我们在水里好不好宝宝我们在水里好不好,宝宝乖老公硬的难受宝宝乖老公硬的难受

发布日期:2021年04月21日
Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
8000000 RMB
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001
Average Lead Time:
Peak season lead time: 6-12 months
Off season lead time: 3-6 months
OEM/ODM Service

Production Line, Steel Wire Pay off, Wire Pay off manufacturer / supplier in China, offering Steel Wire Pay-off Pickling Annealing Take-up Production Line, Gas Fire Wire Annealing Furnace, Steel Wire Hot-DIP Galvanizing Production Line and so on.

Gold Member Since 2016
Audited Supplier
Products Steel wire heat treatment production line Steel Wire Pay-off Pickling Annealing Take-up Production Line
Steel Wire Pay-off Pickling Annealing Take-up Production Line
Min. Order: 1 unit
Port: Shanghai, China
Production Capacity: 15 Units/Year
Payment Terms: L/C, T/T 宝宝我们在水里好不好宝宝我们在水里好不好,宝宝乖老公硬的难受宝宝乖老公硬的难受
Transmission Type: Flexible
Automatic Production Line: Assembly
Certification: ISO, CE
Automation: Automation
Flexible Production: Heat Treatment
Rhythm: Flow Production Line

You Might Also Like

Loading...

Basic Info.

Production Scope
Product Line
Trademark
Singring
Transport Package
Water Proof
Origin
China

Steel Wire Pay-off Pickling Annealing Take-up Production Line

 

1. Company location: Wuxi city; FOB port: Shanghai

2. ISO9001:2008 and CE certified

3. Participate actively in international competition

4. Experience: more than 20 years

5. Professional technology discussion and warm customer service

 

Specifications:

 • Inside furnace fire is directly heaing the steel wire with countercurrent, friendly to environment, high heat transfor efficiency, to make sure the exhaust gas meet the national reguled requirements

 Patend hold, combustion method: pre-mixed burning, accurately control the mixed ratio of air and gas, reduce steel wire oxidation and control decarburization

Steel Wire Pay-off Pickling Annealing Take-up Production Line

 Nozzel with high speed convection is placed at side, resonablely organize the temterature and stmosphare inside the funrace, to make sure the heating quality is steel wire uniformly and stablely
Steel Wire Pay-off Pickling Annealing Take-up Production Line

 Use new and high efficient heat insulation material, little heat loss

 Main control instrument: international famous brand, system running is stable, safe and reliable

• Humanized design and safe function design, to achieve convenient site operation and maintenance.

• Can reach high DV

• Low ordinary maintenance cost

 Suitable for steel cord heat treatment

 • Energy: CNG, LNP, LPG
 

Our Services

• Turnkey project

 • Whole plant or workshop arrangement advise

 • Machines installation and commissioning

 •Train the worker how to operate the production line,and technoly and process trainging

 • Documents include: Foundation drawings, machine drawings, electrical drawings; Machine list, spare parts

   list; Machine operating manual(with pictures), detailed traing manual. (the above would be booked as a 

   delivery book, electric edition available)

 

 

Send your message to this supplier

*From:
*To:
avatar Mr. Hans
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
宝宝我们在水里好不好宝宝我们在水里好不好,宝宝乖老公硬的难受宝宝乖老公硬的难受